If you’ve ever left a meeting nodding along to words you didn’t fully understand, you’re not alone. Building a custom home comes with its own language and it can feel like a lot to take in at first.  

That’s why we put together this simple guide. Below are ten terms you’ll likely hear once your home moves from design into construction, from pre-construction to the final walkthrough. Read through them now, come back to them anytime, and know that our team is always happy to explain anything along the way. When you know what to expect, you can enjoy building your home instead of worrying about it. 

(If you missed our last blog, start with the design-build terms here to learn the words you’ll hear during the design phase.)

1. Custom Home

A custom home is designed and built to reflect a homeowner’s specific lifestyle, preferences, and needs. Unlike a home selected from a predetermined floor plan, a custom home offers opportunities to personalizex the layout, architectural details, materials, and finishes. 

Custom home building allows you to make intentional decisions about how your home looks, feels, and functions. It requires deep collaboration between the client, designer and builder for the best possible outcome. 

2. Craftsmanship

Craftsmanship refers to the highest quality skill, care, experience, and attention to detail applied to the work of building a home. Quality craftsmanship can be reflected in construction details, material installation, finish work, and the overall execution of the design. 

For a custom home, craftsmanship helps turn architectural plans and design concepts into a finished space built for everyday living.

3. Pre-Construction

Pre-construction is the planning and preparation phase before physical construction begins. It may include design development, financing, permitting, scheduling, site planning, and coordination. 

A thorough pre-construction process helps establish expectations and prepare the project for a smoother transition into construction.

4. Site Preparation

Site preparation involves getting the property ready for construction. Depending on the site, this may include clearing, grading, excavation, utility coordination, erosion control, and other necessary work. 

The specific requirements depend on the property’s conditions, design, and applicable regulations.

5. Construction Schedule

A construction schedule outlines the anticipated sequence and timing of project activities. It may include milestones such as site preparation, foundation work, framing, mechanical installations, drywall, finish work, and final inspections. 

Construction schedules can change due to weather, material availability, permitting, design revisions, and other project conditions.

6. Rough-In

Rough-in is the stage when plumbing, electrical and HVAC systems are installed inside the walls, floors and ceilings before drywall goes up. These systems are inspected before the walls are closed in. 

7. Selections

Selections are the materials, finishes, fixtures, and other design details a homeowner chooses for their custom home. Common selections include: 

  • Flooring 
  • Cabinetry 
  • Countertops 
  • Plumbing fixtures 
  • Lighting 
  • Tile 
  • Paint colors 
  • Appliances 
  • Interior and exterior finishes

Selections are an important part of personalizing a custom home. At Duke Homes we have a Selections Coordinator that guides you through the selection process

8. Allowance

An allowance is a budget amount included in a construction agreement for a specified item or category that may not have been finalized when the contract was established. 

For example, a project may include an allowance for lighting fixtures, flooring, or plumbing fixtures. The way allowances are structured varies by contract, so homeowners should review what is included and how changes are handled with their builder.

9. Change Order

A change order is a formal document that records an approved change to a construction project’s scope, design, materials, or cost after the original agreement has been established. 

Change orders may be necessary when a homeowner requests a modification that requires an adjustment.

10. Final Walkthrough

A final walkthrough is a meeting in which the homeowner and project team review the completed home, identify outstanding items, and discuss relevant next steps before or around move-in. 

The timing and scope of the final walkthrough depend on the builder’s process and the terms of the construction agreement. 

You Don’t Have to Know It All 

Building a custom home is a big step and it’s normal to have questions along the way. We hope that this list can be helpful for you to refer to as you get started on your build journey. 

At Duke Homes, we’ve walked alongside clients through the custom home process for more than 40 years. We know that a home this personal deserves clear answers and steady guidance. Our team will explain each step as it comes and answer all of the questions that you have.  